Quality Assurance
A first article inspection proves a production-representative molded part meets every requirement on your drawing. It proves it in a document you can file. A T1 sample cannot do that. T1 answers what the mold does. The inspection answers whether the part meets the drawing, and whether your supplier can prove it.
A PASS stamp proves nothing. A report proves something only when every number traces back to a drawing requirement, a named part, a named cavity, a named measurement and a stated condition.
A T1 sample is not a first article inspection
T1 samples show what the mold does. Fill reaches every corner or it does not, and flash, sink and warpage show up on the parts in front of you. That diagnosis matters, and it is where corrections start. It is not approval. A first article inspection comes later, after corrections. It measures parts molded from production material on the production process, and it records every drawing characteristic. Buyers who treat a good T1 as approval release production on a part nobody has measured against the full drawing. The two gates answer different questions, so keep them separate. Our guide to reading T1 samples, “Reading T1 Samples: What Flash, Short Shots, and Splay Tell You” on plastic-mold.net, covers trial-sample interpretation. Our mold trial checklist for T0 covers what to verify before approving steel changes.
First article inspection is not PPAP
Aerospace formalised the first article inspection as AS9102. The report runs on three forms, covering part accountability, product accountability, characteristic accountability and the signatures that lock them together. Every drawing characteristic gets measured on one to a few parts, and each result is recorded against its tolerance. Automotive took a wider path with PPAP. That package runs to 18 elements. It includes a control plan, PFMEA, gage R&R, and a capability study drawn from a 300-part production run. The dimensional results inside PPAP are, in effect, the same check. The rest of the package asks a harder question. A first article inspection asks whether these parts meet the drawing. PPAP asks whether the process can repeat that result at volume, shift after shift. For a general commercial part, ask for the inspection report. If your customer is automotive, ask whether a PPAP package is also required, and at what level.
Read the report in this order
Start with the revision line. If the drawing revision on the report is not the revision you approved, the rest of the report describes the wrong part. That is the cheapest mistake to catch and the most expensive to miss. Next comes the ballooned drawing. Every dimension, note, tolerance and finish callout on your drawing carries a number, and every number has a row in the report. That discipline starts on the drawing itself. Our 9 proven DFM rules cover the drawing habits that make a clean ballooned drawing possible. A report that lists only “critical dimensions” is a partial check, not a full first article inspection. A partial, or delta, inspection is legitimate after a defined change. It covers only the characteristics the change affects, and it points back to the earlier full report for the rest. Then read the measured values. Each row should show the nominal value, the tolerance, the measured value, and the result. A tick hides how close a dimension sits to its limit. Ask for numbers. Results must come per cavity, not as one averaged part. A multi-cavity mold can pass on average while one cavity fails, and the average will not tell you which one. Our multi-cavity mold balancing guide explains why cavities differ.
Four patterns mark a report you should send back. A summary-only PASS with no measured values cannot be verified. A report measured against a superseded revision describes the wrong part. A single good part presented as capability evidence proves nothing about the process. A dimension-only report leaves material, colour, appearance and function unevidenced, and the failure shows up at assembly.
| Check | What good looks like | Send it back when |
|---|---|---|
| Drawing revision | Matches the revision you approved | Revision differs or is missing |
| Ballooned drawing | Every characteristic numbered | Only “critical” dimensions listed |
| Measured values | Nominal, tolerance, measured value, result | Ticks instead of numbers |
| Per-cavity results | Each cavity reported separately | One averaged part |
| Condition and measurement | Conditioned parts, method and gauge named | Hot parts, unnamed gauge |
| Material and appearance | Grade, lot, colour, visual check included | Generic datasheet, no appearance record |
How many parts is enough?
Sources disagree on sample counts, and no single number is a standard. One inspection house measures full dimensions on one shot and critical dimensions on five. One molder’s standard calls for one piece per cavity, up to 30 cavities, with three per cavity as the fuller option. Commercial guides often quote three to five parts per cavity. [VERIFY] Treat every count as practice, not a rule. The principle is simpler. Measure enough parts, cavity-identified, to show the result is not one lucky shot. I have seen a buyer approve a single cavity’s perfect part while the other cavities shipped out of tolerance. Put the binding count in your purchase order or quality agreement, where it can be enforced.
Condition, measurement and material evidence
Molded plastic moves after it leaves the mold. Parts cool, crystallise and absorb moisture, and dimensions drift with them. Measure parts in their conditioned state, not hot off the press. No universal conditioning time applies across resins, so agree the condition with your supplier for the part at hand. [VERIFY] Name the measurement method for each characteristic. Use CMM for tight dimensions and a named gauge otherwise, with calibration traceable to a standard. A dimension measured on a hot part, or forced into a fixture, says nothing about the part you will receive. Material evidence belongs in the same package. Ask for the certificate for the actual grade and lot, not a generic datasheet for the resin family. Colour match belongs there too, where the drawing specifies it. Appearance needs the same treatment. Report flash, short shots, sink, weld lines and warpage as observed or absent. A part can be dimensionally correct and still unshippable on appearance.
What a passed FAI does not prove
A passed first article inspection proves those parts conform. It does not prove the process will hold tolerance over thousands of shots. Wear, material-lot drift, process drift and shift changes all arrive later, and no first article can see them coming. That is what in-process inspection is for. If you need repeatability evidence, ask for it separately. Get process-capability data, Cpk or Ppk, on critical dimensions from a production run. Cpk of 1.33 or higher is the target most buyers cite, but it is a common target, not a universal pass mark. [VERIFY] Do not treat a capability number as part of every inspection. It is a separate ask, with its own sample size and its own cost. A stable, documented process makes both gates easier, and our scientific molding guide explains how that window is built.
Approve, approve conditionally, or reject
Three decisions exist, and only one of them releases production without conditions. Approve when every characteristic passes and the package is complete. Approve conditionally when the fix is named and the re-check is named with it. One dimension gets re-measured after a steel-safe correction, covered by a delta first article inspection with a new date. Reject when nonconformances are named and the inspection must be repeated after correction. If a dimension failed, the correction belongs in steel or process. The re-measurement belongs in a new, dated record, never in an edited old one. Sign the report itself, not just the email it arrived in. The signed report and the retained sample parts become the reference if a later batch is disputed. Keep a master sample on both sides. Before you sign, run this checklist.
- Is anything on the drawing missing from the ballooned drawing and the full characteristic list?
- Do the drawing revision, material grade and lot, cavity identification and measurement condition match the approved revision and the production setup?
- Are measured values, not ticks, recorded for every characteristic, per cavity, and how close is each one to its limit?
- How many parts were measured, and is this a conformance check or a capability claim?
- If capability evidence is needed, has Cpk data been asked for separately?
- Are the material certificate, colour, appearance and function results in the same package, or promised separately?
- On a failure, who corrects what and what gets re-measured? Does the approval get re-signed as a delta FAI with a new date?
- Are sample parts retained by both sides against the signed report?
Frequently Asked Questions
What is a first article inspection in injection molding?
A first article inspection is a formal, documented check that production-representative parts meet every requirement on the engineering drawing. Every dimension, note, tolerance, material callout and finish requirement gets measured and recorded, usually on one to a few parts from the production process. The result is the inspection report. It is the document a buyer signs to release production, not a verbal assurance that the parts look right.
How is a first article inspection different from PPAP?
A first article inspection checks a handful of parts against the drawing and records every characteristic. PPAP is the wider automotive approval package. It runs to 18 elements, including a control plan, PFMEA, gage R&R and capability data from a 300-part production run. The dimensional results inside PPAP are, in effect, the same check. A general buyer usually needs only the inspection report. An automotive buyer should ask which PPAP level applies as well.
How many parts does a first article inspection cover?
Practice varies, and no single count is a universal standard. One inspection house measures full dimensions on one shot and critical dimensions on five. One molder’s standard calls for one piece per cavity, with three per cavity as the fuller option. Commercial guides often quote three to five parts per cavity. Ask for enough parts, cavity-identified, to show the result is not one lucky shot, and put the binding count in your purchase order or quality agreement.
Does a passed first article inspection guarantee production quality?
No. A passed inspection proves the parts measured conform to the drawing. It does not prove the process will hold tolerance over thousands of shots, because wear, material-lot drift, process drift and shift changes all arrive later. Repeatability needs separate evidence, process-capability data, Cpk or Ppk, on critical dimensions from a production run. Cpk of 1.33 or higher is the target most buyers cite. Treat a passed inspection as a gate, not a guarantee.
What should I do if one dimension fails the first article inspection?
Do not release production on that characteristic. The correction belongs in steel or in the process, and the re-measurement belongs in a new, dated record, never in an edited old one. Ask for a delta first article inspection covering only the failed characteristic, with the unchanged characteristics referenced to the earlier full report. Re-sign the approval only when the new record shows the dimension inside tolerance.
Before you sign the next report, read the revision line first. If that line is wrong, nothing below it matters. A PASS stamp is a claim. The measured values, the cavity, the condition and the signature are the proof. What does your supplier’s report actually prove?
Questions about a report you received? Contact us and we will read it with you before you sign.