How to Run a First Article Inspection on Injection Molded Parts

Mass Production and Quality

How to Run a First Article Inspection on Injection Molded Parts

A first article inspection proves the mold, the material and the process can make your part before production starts. It checks every requirement on the drawing, one by one, on parts from the first production run, and it records each result. A T1 trial finds what needs correction. A first article inspection comes after the corrections, on the approved trial, and it is the document you sign before release. Approve it only when the report covers every ballooned characteristic and shows readings for every cavity. It must also name the material lot and the process settings, and it must end with a signed decision.

How is a first article inspection different from T1 samples?

T1 is the first trial judged against the drawing, and its job is to find what the mold still gets wrong. For the first trial itself, see the T1 sample measurements guide, which covers what to measure on that trial, cavity by cavity.

A first article inspection is the formal report for a part that is ready to approve. It usually follows the final trial, after the corrections are in.

T1 asks whether the steel copied the design. The first article asks whether the corrected mold, the chosen material and the set process can repeat that result.

That difference sets the scope. T1 can be a short dimensional check on the features that decide fit. A first article covers every characteristic on the drawing, with no feature skipped.

The aerospace standard AS9102 draws the same line. Its first article guide says the inspection checks whether the production process can make a conforming part. It also states that the inspection is not a product acceptance document.

Accepting the first article does not accept later production by itself. Later runs still need their own inspection plan, which the report should name.

What does the first article report have to contain?

A report with only a pass column proves nothing, because you cannot see what was measured or how. Ask for the full package, and check each piece against this list.

AS9102 organizes the evidence into three forms, and the layout works as a template even when your order names no standard.

Form What it records
Form 1 Part number, drawing revision, FAI type, signatures
Form 2 Material, special processes, functional tests, certificates
Form 3 Every drawing characteristic, measured result, gauge used

Form 3 is where the measuring work sits. Each line on Form 3 ties one numbered drawing feature to one measured result and the gauge that took it.

The ballooned drawing is the backbone of the report. Every dimension and note on the drawing gets a number. Each reading then has a reference, and no feature can slip past unmeasured.

Material evidence follows the dimensions. The report should name the resin grade, the supplier certificate and the lot number. Those three lines tie the measured parts to the material that was molded.

The process record lists the machine, the press tonnage, the main settings and the cycle time used for the sample run. If the sample came from a different press or a different setting, the numbers describe a different process.

The clamping force tonnage guide on this site explains how press tonnage is sized for the part. Compare that number with the press named in the report.

Visual evidence closes the package. Photos of the part, taken against the cosmetic limits you agreed, show the surface the numbers cannot describe.

Functional checks belong in the report too, when the drawing calls for them. Fit, assembly, torque and leak tests each get a result line, not a note that says passed.

The last line is the decision. Write approved, approved with conditions, or rejected, and put a name and a signature beside it. A report with no decision is a data sheet, not an approval.

If your purchase order names AS9102, work to the revision it states. The current text is AS9102C, issued in June 2023, and a drawing that says only FAI per AS9102 leaves the revision open.

If your order names no standard, agree the format in the request for quotation. The AS9102 layout still works as a template, because it ties each result to a numbered drawing feature.

How many parts should you measure, and from which cavities?

Measure parts from every cavity, because each cavity has its own dimensions. One good cavity proves nothing about the rest of the tool.

A standard first article sampling plan from a rubber molder gives two options. Option one measures one piece per cavity for molds up to 30 cavities. Option two measures three pieces per cavity for the same range.

For molds above 30 cavities, the same standard samples about 30 cavities, and above 120 cavities it samples a quarter of them. The count scales, but the rule behind it does not change. Every cavity that is sampled gets its own readings.

Take more than one part per cavity on the dimensions that decide fit and function, so the spread inside one cavity shows. One part per cavity hides that spread, and a single lucky shot can pass a cavity that drifts.

Pull the sample parts from consecutive shots, after the process has settled. Hand-picked parts flatter the mold, while consecutive shots show the spread your production will live with.

Mark each part or bag with its cavity number before measurement starts. A reading with no cavity number cannot be traced back when one cavity runs out of tolerance.

Cavity-to-cavity spread is usually a balance problem, not a steel problem. The multi-cavity mold balancing guide on this site shows how to test fill balance with short shots at production speed.

Keep the measured parts as retained samples, labeled by cavity, for later comparison. When a later lot is questioned, those parts are the reference the report points to.

State the quantity per cavity in the purchase order, before the mold is cut. A number agreed after the trial is a negotiation, not a plan.

When should the parts be measured?

Plastic dimensions move after molding, so the clock matters as much as the caliper. Parts shrink as they cool, and they can keep shrinking for hours. Nylon absorbs moisture and grows over days.

A common practice is to wait at least 24 hours at room temperature, then measure. A first article inspection buyer guide gives the same wait time. It adds conditioning for nylon and a lab near 20 to 23 degrees.

Agree the wait time and the conditions in writing, before the trial. A fast reading cannot stand in for a settled one.

Conditioning matters most for resins that take up moisture. Nylon is the common case, and the plan should state the drying or conditioning step before measurement.

Match the instrument to the tolerance. A caliper does not suit a feature with a tolerance of a few hundredths of a millimeter. A CMM, a vision system or a pin gauge may be needed instead.

Record the gauge beside each reading. The sampling standard above requires results from NIST traceable measuring devices, and a reading without a named instrument is hard to trust.

Measure only after the process has settled at its production settings. A trial that is slowed down to protect the tool can hide a cavity that fills late at production speed.

The scientific molding process window guide on this site shows how a locked window is built. It comes from measured studies, not from trial and error.

Flexible parts need a defined fixture, so the part is held the same way for every reading. A thin part can measure differently when clamped, so the support method should be on the drawing or in the plan.

How do you read the report before you sign?

Do not read the pass column first. Read the report in this order, and stop at the first step that fails.

Completeness → raw numbers → near-limit values → cavity spread → method → material → visual → function

Check completeness first. Every ballooned dimension and note must be present, and every cavity must be covered. A missing balloon is a feature nobody measured.

Read the raw numbers next. Real data shows scatter, so readings that all sit at nominal deserve a second look. A column of identical values usually means the parts were not measured one by one.

Flag the near-limit values. A part that barely passes will fail when the process drifts, so those features go on the monitoring list for production.

Compare the cavities after that. One cavity that runs consistently different from the rest points at the mold. The fix is a mold correction or a documented offset.

Check the method after that. The instrument must suit the feature and the tolerance, and the report must name the gauge for each reading.

Check the material and the process too. The resin grade and lot must match the purchase order. The settings must look like a stable setup, not an unusual one.

Check the photos against the cosmetic limits you agreed. Fit the parts into your assembly, if you can, before you sign.

Measure a few critical features yourself, or through a third party on your side, when the program is large. Compare your numbers with the plant numbers before you sign.

What happens when a characteristic fails?

Failure on the first article is normal, and the next step matters more than the failure. Ask for a written list of nonconforming characteristics, by cavity, with the root cause for each one.

The cause sits in one of four places. It can be the mold dimension, the process, the material, or the drawing.

A correction to the steel goes through the mold maker and takes time. A process correction can be tried at the next trial.

Agree whether the next round is a full first article or a partial one on the corrected features. A partial first article covers only the characteristics touched by the change. It points to the baseline part number from the first report.

Do not accept a promise to fix it in production. Production should start only after an approved first article, or with written conditions that name the fix and the date.

Record the revision and the decision in writing, so the next trial starts from the same document. A correction with no recorded revision is a correction nobody can verify.

When do you need a new first article after approval?

Approval is not permanent. A new first article is due when something changes that could affect conformance. The list of triggers is short enough to write into the purchase order.

A design change that affects how the part fits or works starts the list. A change in manufacturing source, process, inspection method, location, tooling or material follows it.

A mold repair, a mold transfer, a new press, or a new resin grade each call for a new first article. A drawing revision does the same, even when only one dimension moved.

A lapse in production is the trigger buyers forget most often. AS9102 sets the lapse at two years, counted from the last production operation to the restart. The purchase order decides when clauses differ.

A partial first article is enough when only some characteristics changed and the rest still come from the originally approved processes. Some customer clauses still demand a full first article, so read the clause before you agree the scope.

Keep the approved report and the retained sample parts, the process sheet that produced them, and the agreed inspection plan for production.

For long programs, add ongoing capability data on the dimensions that decide fit. That data shows whether the process holds its margin after the first article is signed.

Write the first article format, the piece count per cavity, the wait time and the approval step into the purchase order. Do it before the order is placed, not after the trial. When the report arrives, check completeness first, then the raw numbers, then the cavity spread. Sign only when every balloon has a reading, every reading traces to a cavity, and the decision line carries a name.